THE SHORT ANSWER
  • Identify which roof sections are being replaced and which solar equipment is in the way.
  • Get the roofing scope and the solar removal and reinstallation scope in writing.
  • Confirm who will check the system and show you it is producing again.

Do the solar panels have to come off?

For a roof replacement under a rooftop solar array, plan to have the equipment removed by a qualified solar installer before the roofing crew starts on that section. The U.S. Department of Energy describes removal before replacement and reinstallation after the roof is complete. If the proposal only covers a separate roof section, ask both contractors whether the array or its wiring affects access or the work boundary. The answer depends on the layout.

Homeowners in Pace or Pensacola can start with the solar proposal, installer contact information and any array layout or equipment records already on hand. Photos taken from the ground can help show which slopes carry panels. Leave roof access, shutdown and electrical work to the appropriate professionals.

Technical references: U.S. Department of Energy — Solar frequently asked questions

Compare the two written scopes

Ask for written scopes even if one contractor coordinates both crews. The roofing scope should identify which slopes are being replaced and how old mounting and wiring openings will be addressed. The solar scope should say which panels, rails, mounts and other components are being removed, where equipment will be stored and which components are expected to go back on. Have the teams agree on who handles any new roof penetrations.

If either contractor expects the other to handle a task, have them settle it before you approve the work. For example, if old mounts will be removed, ask who documents the exposed area and who handles any deck repairs identified after tear-off. If the solar installer proposes new mounts, ask how their location and installation will be coordinated with the roofer and the selected roof system.

Agree on the handoff before picking a start date

  • Who confirms solar removal is complete before roofing starts?
  • Who confirms the roof is ready before the solar crew returns?
  • Where will the equipment be stored while it is off the roof, and who is responsible for it?
  • How will weather delays or newly discovered roof work affect the second appointment?
  • Who will check operation after reinstallation and show you what to look for in the monitoring system?

What if you are planning to add solar later?

If panels are still in the planning stage, share your roof age and condition with the solar installer before setting an installation date. The Department of Energy recommends considering roof age and working with an installer to assess whether the roof is suitable. If a reroof is already under consideration, coordinate the order before either crew begins.

For roof replacement in Escambia or Santa Rosa County, call Super Roofers at (850) 805-4766. Mention the array when you request the estimate so the roofing scope can account for the equipment and the handoff with your solar installer.

Technical references: U.S. Department of Energy — Step-by-step guide for consumers going solar

Sources & further reading

Product instructions and requirements can change. Confirm the current documents for your selected system and property.

Related roofing services

Roof replacement services ↗Roofing in Pace ↗Roofing in Pensacola ↗Escambia and Santa Rosa roof replacement estimate checklist ↗